Oil & Gas – Quadrants – Exxon Mobil – Oxnard, CA

EDCO was contracted by Harbor Offshore to fabricate two quadrants for an Exxon Mobil platform in Oxnard, CA.  The work included shop drawings, material procurement, welding, machining, non-destructive MT and UT testing, test assembly, coatings, expediting, shipping preparation and load out. The work was completed on schedule, without shutdowns or cost overruns and to the full satisfaction of the customer.

Installation by customer on oil platform