Civil and Structural

WASHINGTON DEPARTMENT OF TRANSPORTATION

Sound Transit – Seattle, WA – 2019-2024
Currently, EDCO is working with Atkinson Construction on Sign Bridges. In 2019, EDCO completed work on the Sound Transit East Link OCS Portal Frames with Kiewit-Hoffman JV.

Details

Port of Everett

Everett, WA
In 2018 EDCO began work on the Port of Everett project with Advanced American Construction, providing a wide array of miscellaneous metal fabrications.

Details

Waste Water Treatment Plant

Joint Base Lewis-McCord, Dupont, WA
From 2014 to 2016 EDCO was contracted by CDM Constructors, Inc. to provide all labor, materials, and equipment to fabricate miscellaneous metals associated with the Waste Water Treatment Plant at Joint Base Lewis-McCord in Washington State.

Details

PSE Baker River Fish ByPass

Concrete, WA
From 2008 to 2010 EDCO was contracted by CDM Constructors, Inc. to provide all labor, materials, and equipment to fabricate metalwork associated with the Puget Sound Energy Baker River Fish Bypass, Concrete, WA.

Details